Not only painting job has taken place, which is going all the way around the stadium. The guttering was cleaned out all the way round. The front path was professionally cleaned, which resulted in the SUFC coloured paving once again visible.
In the coming weeks solar panelling is being fitted free of charge which is going to cut the electric bill right down once installed.
Both the 1st team and training pitches are getting fully replaced, which Michelle paid a fee for, but comes with a partnership with said firm who is throwing in pitch maintenance for 2-3 years “can’t remember what she said in the interview”
The iron bar is getting a refurbishment too.
As the OP stated, all mostly being carried out for free. The paint job looks really nice and goes with the Attis Arena signage spot on. Starting to look quite smart now. I think I recall the new catering guy is smartening up the cooking points too and bringing new equipment.
The head of catering comes with a fantastic CV as he did a brilliant job at Hull KR. In my opinion everything is looking extremely promising. Not only do we have owners who love the club, the general public is pouring love into the club. As mentioned above, once all the work is carried out, I’m sure the ground will be looking fantastic by the start of this coming season.